A special meeting of the board of directors of the Madera Irrigation District was called to order at 10:30 a.m. on November 12, 2026, by President Dave Loquaci at the district offices. He led the Pledge, then announced there was no reportable action from the closed session held the previous half hour. There were no conflicts of interest on the agenda and no public comment in person or online. Vice President Brian Davis was present online and Director Tim DaSilva was not able to attend.
The consent agenda was presented with 17 items revising the district policy manual. These were described as updates, or as required by law or reflecting the new retirement program. Also included was a resolution declaring surplus equipment – two pickup trucks, a backhoe and two trailers.
In moving to accept the consent item, Director Carl Janzen commented on the over 80 pages of required reading updating the policy manual, and the motion was seconded and passed unanimously.
GM Report
General Manager Tom Greci reported next, saying the Friant Authority offsite meeting would be held Nov. 17 – 19 in Bakersfield. He said LAFCO had approved the annexation to the district of the property in Fairmead with the new recharge basin. He was hopeful of county approval shortly. He said there had been good feedback from the growers meeting and luncheon held Oct. 20.
He said the Madera – Chowchilla Water & Power Authority operating license is up for renewal, itself a complicated process. He said that on Nov. 16 that board would be making a recommendation to renew or perhaps not to, and instead, shutting down the plants. Any decision would be coming back to the MID board for approval.
He said the agreement with the county on the recharge basin on Ellis Street had expired. He said MID wants to include the city in a new agreement but has had no response from county officials. He said the city has lots of water in a wet year in an area that needs recharge.
He concluded his report saying that across the district, recharge basins and access canals were all ready to go for the first rainstorms of the season.
And speaking of the city and recharge basins, the first item of new business was a revision of the agreements with the city on some 28 recharge basins operated jointly. Previously, each basin had its own documented contract. The proposal here was to include them all in a single agreement, since the partnership with the city is working well. The new agreement covers all the basins and can be easily amended. As part of this arrangement, the district may install pipelines or canals to move water into and between such basins, all to increase recharge capabilities. Assistant GM Dina Nolan observed that the working relationship with the city is excellent to the benefit of residents, taxpayers and district members alike. The resolution to approve the agreement passed unanimously.
New Headquarters Facility Planning
A meeting highlight was the presentation of the site plan and facilities work by NJA Architecture regarding a new district campus. NJA principal Nick Steward did the honors with PowerPoint. His firm had been retained to work with district officials and a board committee to develop a plan for new facilities and layout. His firm, based in Lodi, Calif., has worked with many public agencies and is familiar with the practical and legal requirements involved.
He said the goal was to design functional, safe and secure facilities and to recommend next steps. He presented a preliminary plan for the layout on the north end of the current property that borders Rd 28 ¼ on the east and Avenue 12 on the south. District staff, both admin and operating, would remain in place until the new facilities were completed and ready for move-in.
He presented floor plans for a 16,000 sq ft administration building along with two 15,000 sq ft shop buildings, with parking for employees and the public, bounded by secure fencing while allowing convenient public access. He also illustrated the architectural style of the new office which was attractive but not elaborate and in keeping with the agricultural role of the district and its neighbors on the south side of Madera.
Assistant GM Nolan commented that security is an increasing concern with transient people, not always friendly, on the property and entering the building. She said theft and damage to equipment stored outside is also always an issue.
The admin building would offer a much more practical location of department offices than the current facility which requires staff to move through the public lobby to get to other offices. Departments as they operate currently would be arranged conveniently and a new training room would be included which could also accommodate public meetings.
The storage buildings would be of pre-manufactured metal construction. One would include offices for operating staff, a break room, small meeting space, locker room and restroom facilities and room for equipment storage. The layout would allow a staff member to check out equipment as its used, along with providing storage for chemicals and chemical vehicles with an outdoor wash rack.
The other building would house the maintenance shop and have four bays, including storage for lifts and cranes. This building would include the mechanics and welding shops, with an attached canopy that would allow for outdoor work in the shade.
President Loquaci, who serves on the building committee with Director Janzen, said the goal is to have a functional and esthetically pleasing office, but not “Taj Mahalish.” After discussion, the board by consensus approved the next step of searching for a general contractor who would work with the architects and the district to develop final plans and of course, estimated costs, moving to a construction contract. The involvement of a contractor in the planning process, in the experience of NJA, results in a more satisfactory, cost effective and timely project, from permitting to move-in.
At the district’s next board meeting, December 15, some early cost estimates may be included so that the construction project can be included in the 2027 budget and beyond. The plan is to fund the project as part of operating budgets with no bond or borrowing required.
The meeting concluded with brief comments from directors and the meeting was adjourned at 11:40 a.m.
DISCLAIMER OF RESPONSIBILITY; Waterwrights strives to provide clients with the most complete, up-to-date, and accurate information available. Nevertheless, Waterwrights does not serve as a guarantor of the accuracy or completeness of the information provided, and specifically disclaims any and all responsibility for information that is not accurate, up-to-date, or complete. Waterwrights’ clients therefore rely on the accuracy, completeness and timeliness of information from Waterwrights entirely at their own risk. The opinions expressed in this report are those of the author and do not represent any advertisers or third parties.
ALL RIGHTS RESERVED. Copyright 2026 by WaterWrights.net
Madera Irrigation District – 12152 Road 28 ¼ Madera, CA 93637 559/673-3514
Staff: General Manager -Thomas Greci, Assistant GM – Dina Nolan
Board: Dave Loquaci, president; Brian Davis, vice-president, Brandon Bishel, Tim DaSilva and Carl Janzen
HISTORY: From www.madera-id.org The Madera Irrigation District (MID or District), founded in 1920, encompasses an area of approximately 139,665 acres. MID operates a primarily gravity irrigation distribution system with approximately 300 miles of open flow canal systems as well as 150 miles of large diameter pipelines.
The District has a Central Valley Project (CVP) repayment contract with United States Bureau of Reclamation (USBR) providing up to 85,000 acre feet (AF) of Class 1 and 186,000 AF of Class 2 water per year from the Friant Division (Millerton Lake). The CVP water is released from Millerton Lake through the Friant Dam, and then conveyed through the Madera Canal for delivery into the District’s service area. The District also entered into a CVP repayment contract with the USBR for the yield from the Hidden Unit (Hensley Lake). Under the Hidden Unit contract, the average annual supply available to the District is approximately 24,000 AF per year.
DWR SGMA # 5-022.06